Monday, February 21, 2011
Brick House Great Room Floor
After finishing the fireplace, it was time to fix the floor which had a big bump in it. Jeff Coffin returned to pull up the floor, remove the forms for the concrete base, build a crawl to the summer house and replace the flooring that did not match after the mantle and wall were removed.
A new fir floor was installed. The folks from Zimba Plastering returned to get the walls on both sides of the fireplace re plastered and the ceiling finished. Jean Moore returned to paint it all up before Josh Wagner arrived to sand and finish the floors. Josh did a great job and blended the old with the new very well.