Saturday, March 11, 2017

New Barn goes up.

2012 WAS A BIG YEAR, at the farm.  We had been planning a storage barn and were able to line up David Harriman of Readfield to put up the building.  David and his able crew framed the building on the ground and with the use of his crane, raised all of the walls on a Monday.  They stabilized the walls and prepped the scaffolding on Tuesday and flew the trusses on Wednesday all in Mid October.  We left the building at stud while the remnants of Hurricane Sandy blew thru.  The building was completed in November and the floor was poured over the Thanksgiving holiday.  We took possession in early December after the doors were installed.